Description
Automatically redirects LP gas vapor flow from an empty designated service cylinder to a reserve cylinder without interruption. Green indicator dome changes to red when the service cylinder needs to be filled.
• 1/4″ Inverted Flare Inlet Connections
• 3/8″ FPT Outlet Connection
• Zinc Die Cast
• Molded Rubber Diaphragms
• UL Approved
• 2nd Stage Relief Mechanism Per UL 144
• Powder Coated
Explore more from our collection.





Reviews
There are no reviews yet.